Legal analysis
According to the relevant regulations, places that have not passed the fire inspection cannot be rented. Generally speaking, before renting, the owner must first apply to the fire department; Then it is necessary to carry out relevant acceptance and filing according to relevant standards; Finally, it can only be put into use after it is confirmed to be qualified. Without acceptance, it is not allowed to be put into use, otherwise safety cannot be guaranteed. Specific process of fire control acceptance: 1. After the project is completed, the owner will apply to the local authorities for acceptance, so some relevant certification materials need to be prepared when applying. Mainly include: application report, quality inspection and certificate of fire-fighting equipment, relevant certificates of flame-retardant materials, factory certificate, project completion acceptance report, identity certificate of project leader and testing unit, etc. 2. Upon receipt, the relevant departments will check in advance whether the submitted materials are complete and whether the documents provided meet the relevant requirements, and then notify the project owner within 1 to 2 days before acceptance. The inspection is generally carried out by two or more supervisors on the spot, and they need to wear real inspection certificates. Then the owner introduces the self-inspection and design, debugging the equipment, and finally records the situation truthfully. 3. If there is no problem, all the personnel involved in the inspection need to sign the declaration form and fill in the comments, and the applicant will file for examination and approval. After the audit, the owner can receive opinions according to the receipt. There are problems that need to be rectified, and the second inspection can only be carried out after rectification.
legal ground
Article 13 of the Fire Protection Law of People's Republic of China (PRC) * * * The competent department of housing and urban and rural construction in the State Council stipulates that the construction project that should apply for fire control acceptance is completed, and the construction unit shall apply to the competent department of housing and urban and rural construction for fire control acceptance. Other construction projects other than those specified in the preceding paragraph shall be reported to the competent department of housing and urban and rural construction for the record after acceptance by the construction unit, and the competent department of housing and urban and rural construction shall conduct spot checks. Construction projects that should be subject to fire control acceptance according to law are prohibited from being put into use without fire control acceptance or unqualified fire control acceptance; Other construction projects that fail to pass random inspection according to law shall stop construction.