construction project
Construction bidding documents
Project name: Project
Bidder: (Seal)
Legal representative or entrusted agent: (seal)
Date of Issue: Year Month Day
bidding document
Zhao Jian (200)
Tenderer:
Project name: Project
Tender method: open tender
Document preparation unit:
Approver:
date month year
catalogue
The first chapter instructions (3)
Section 1 Basic information of the project subject to tender (4)
Section 2 Project Construction Scale (4)
Section 3 Bidding Basis (4)
The fourth quarter instructions (4)
Chapter II Format of Bidding Documents (16)
Chapter III Text Format of Construction Contract (24)
Chapter IV Technical Specifications (50)
Chapter 5 Drawings (5 1)
Chapter VI Bill of Quantities (52)
Chapter I Instructions for Bidding
Section 1 Basic information of the project subject to tender
1 construction tendering unit
2 Project subject to tender
3 design unit
4 Project address
5 Construction scale
6 sources of funds
7 Require the bidding enterprise level
8 The number of units to be selected is 1.
9. The engineering quality requirements are qualified
10 Commencement and Completion Date Commencement
Completed on year, month and day.
Section 2 Project Construction Scale
2. 1 The construction area of the project is square meters, of which:
Section 3 Bidding Basis
3. 1 Bidding Law of People's Republic of China (PRC) and Regulations of the Ministry and Bureau on Bidding Management of Railway Engineering Construction.
3.2No. of construction bidding documents approved by the bidding office: Zhao Jian ().
Section 4 Instructions for Bidding
4. 1 tender documents
4. 1. 1 Instructions to Bidders, bidding document format and construction contract text format.
4. 1.2 Project construction documents:.
4. 1.3 technical specifications:.
4. 1.4 Bill of Quantities:
4.2 Related expenses
4.2. 1 The bid document price is RMB/set, and the drawing deposit is RMB. Before submitting the bidding documents, the drawings will be sent and the deposit will be refunded.
4.2.2 The bidder shall pay a bid bond of RMB yuan as required.
4.2.3 The winning bidder shall pay the construction performance bond of RMB yuan as required.
4.3 Bidding contents:
4.3. 1 Drawing All design contents shall be deducted.
4.3.2 Contract mode: 4.3. 1 The project adopts general construction contract.
4.3.3 Duration: starts from and ends at.
4.3.4 Quality requirements: The quality requirements of this project are qualified, and the evaluation criteria are based on the current national construction acceptance specifications and evaluation methods.
Other requirements:
(1) The bidder must be an enterprise with the qualification of general contracting (or professional contracting) of engineering construction, and the qualification of project manager must be above the level, and hold the construction project bidding access certificate issued by taiyuan railway administration Construction Department, the credit record certificate issued by the law firm, and the corresponding business license, qualification certificate, safety production license, legal person or power of attorney.
(2) The applicant shall voluntarily accept the Regulations of taiyuan railway administration Municipality on Construction Project Management and Bidding.
(3) The tender documents and drawings are the main basis for compiling the tender documents, and the tenderee shall compile and submit the tender documents as required (two originals and three copies of the tender documents).
(4) Once the bidding documents are delivered, it means that the bidding enterprise confirms the legal effect of the bidding documents and assumes legal responsibility for the promises of the bidding documents.
(5) This tender is subject to the "one-time tender letter", and any changes after the deadline for submission of the tender letter will not be accepted.
(6) Bidding schedule:
On the day of registration, the tender documents will be sold on the same day.
4.4 Reconnaissance the site
4.4. 1 The tenderee will organize or not organize on-site investigation, and the time is: year, month and day.
4.4.2 All expenses and other problems arising from site investigation shall be borne by the bidder.
4.5 Question and answer session
4.5. 1 The Q&A meeting is scheduled to be held from to, and the bidder can send three people to attend.
4.5.2 The bidder shall deliver the questions that need to be answered by the tenderer to the tenderer in written form.
4.5.3 The tenderee shall explain and answer questions in written form; The tenderee is responsible for explaining all matters of this tender.
4.6 Bidding documents
4.6. 1 bidding document language
The bidding documents and the correspondence between the tendering unit and the tendering unit related to bidding are all in Chinese.
4.6.2 Composition of bidding documents
4.6.2. 1 bidding
4.6.2.2 legal representative qualification certificate or legal representative's power of attorney for this project bidding.
4.6.2.3 Quotation Commitment Letter (affixed with the seal of legal person and legal representative)
4.6.2.4 fulfilled the wage commitment list of migrant workers. The bidder must make a written commitment to pay the wages of migrant workers in time (with the seal of legal person and legal representative).
4.6.2.5 Construction Organization Design
Other issues that need to be explained in 4.6.2.6.
4.6.2.7's bidding documents include three parts: commercial tender, technical tender and economic tender.
(1) business standard includes
Bidding;
Business license, qualification certificate, safety production license, access procedures, credit certificate, legal representative qualification certificate or legal representative's power of attorney for bidding of this project. Construction experience, project quality performance, safety and quality of similar projects, commitment to tender documents, etc.
(2) the technical standard includes
Construction organization design (main contents: construction organization and method, construction site layout, construction technical measures, engineering quality assurance measures, safety production measures, civilized construction measures, construction progress plan, project manager, construction machinery and equipment to be invested, institutions and personnel to be invested in this project).
(3) Economic standards
Method 1: No pre-tender estimate is set, only a promise is made: promise whether to agree to deduct Party A's related expenses (minus%) from the approved budget estimate as the total contract price, that is, 10,000 yuan (including/excluding Class II changes) (it must be indicated in words and stamped with the seal of the legal person and legal representative).
Method 1: To set the pre-tender estimate, the bidder must have a specific quotation (stamped with the seal of legal person and legal representative).
The number of copies and signatures of 4.6.2.8's bidding documents.
(1) The bidder shall provide two originals and two copies of the bidding documents at the same time, and clearly mark "original" and "copy". If there is any discrepancy between the original and the copy of the bidding documents, the original shall prevail.
(2) The original and copy of the bidding documents are sealed in standard envelopes respectively, and stamped with the official seal of the unit. The cover of the sealed bag is printed with the name of the project, the name of the bidding unit and the seal of the legal person and legal representative.
(3) Format and paper requirements
Format: The tender letter is divided into cover, catalogue and text.
B font and font size requirements: the cover is standard bold No.65, with the word "bid letter" printed vertically in the middle with a spacing of 3CM. The name of the project is printed above the bid letter, and the bidder and its legal representative are printed below, all of which are "Song Ti" No.4 (2.6cm up and down, 3cm left and right).
C. Paper quantity requirements: A4 paper shall be used uniformly, and the width of the network diagram shall be A4 paper, and the length is not limited. Can only be drawn on a piece of paper, and the general layout can only be drawn on a piece of A4 paper.
D. Binding method: use uniform staples (or uniform extended staples) to vertically staple two on the left side of the standard letter, and the staples are exposed without other packaging or decoration.
Other matters in 4.6.2.9:
(1) During the bidding process, all units and relevant personnel shall strictly abide by the bidding records and professional ethics, severely punish the units and individuals that violate the bidding regulations according to the seriousness of the case, and cancel their bidding qualification at the same time.
(2) If the bidder wins the bid, it shall sign the construction contract, clean government agreement and go through all kinds of construction application procedures in time according to the requirements of the tenderer, otherwise the tenderer has the right to deal with it according to the regulations.
(4) This project shall not be subcontracted. If subcontracting is found, the tenderer has the right to repel the winning bidder at any time, and all losses caused thereby shall be borne by the winning bidder. The winning bidder shall not subcontract the winning project.
4.7 Bidding
4.7. 1 The bidder shall send the bid documents to the tenderee before, and receive them by the tenderee. The tenderee does not accept the bid documents delivered late.
4.7.2 The legal representative or entrusted representative of the bidder shall attend the bid opening meeting at the specified time and place, and carry valid certificates.
4.8 bid opening
4.8. 1 The bid opening meeting will be held on, and presided over by the tenderer.
4.8.2 In any of the following circumstances, the bid documents will be regarded as invalid.
4.8.2. 1 Late delivery of bid documents;
4.8.2.2 did not pack in the prescribed format;
The legal representative or appointed agent of the bidder in 4.8.2.3 failed to attend the bid opening meeting on time.
4.8.2.4's bid documents are not filled in according to the provisions of the tender documents;
4.8.2.5 disturbed the order of the meeting, but he was still unreasonable after being dissuaded.
4.9 Bid evaluation and calibration
4.9. 1 The tenderer shall organize the establishment of a bid evaluation committee composed of five judges in accordance with the relevant provisions of the Detailed Rules for the Implementation of Bidding and Evaluation for Railway Construction Projects in taiyuan railway administration.
4.9.2 According to the bid evaluation method approved by the bidding office, the effective bidding documents are comprehensively compared and scored, and sorted according to the scores.
4.9.3 The tenderer will determine the person with the highest score as the first winning bidder according to the written bid evaluation report of the bid evaluation committee.
4.9.4 The tenderee shall issue a bid-winning notice to the winning bidder within 5 days after winning the bid, and notify all unsuccessful bidders of the bid-winning result.
4.9.5 bid evaluation principles
Strictly abide by the principles of openness, fairness, impartiality, honesty and credibility, select the best construction unit, and effectively control the project quality, safety, investment and construction period.
4.9.6 Evaluation criteria of supervision team
It is composed of the discipline inspection commission, supervision and other relevant departments of the bidding unit.
4.9.7 bid evaluation method
The comprehensive evaluation method is adopted in bid evaluation, and the jury will only comprehensively evaluate the effective bidding documents according to the quantitative evaluation method, using the percentage system. Including business standard 15, technical standard 45 and economic standard 40. The score shall be kept at two decimal places, and the third place shall be rounded off. After the judges score, the winning candidates are ranked according to the arithmetic mean of the scores. The highest score is the first successful bidder.
4.9.8 bid evaluation criteria
1, business standard (15)
1. 1 enterprise qualification and quality system certification (2 points)
1. 1. 1 The bidder has the qualification grade that meets the requirements of the tender documents (1 minute).
1. 1.2 The bidder has obtained the quality system certification (1 min).
1.2 construction experience of similar projects (2 points)
The bidder has undertaken projects similar in scale and specialty to the project subject to tender in recent three years (2 points).
1.3 project quality performance (3 points)
The bidder won the Luban Award for the project quality in the past three years, with 3 points for each item; 2 points for each provincial-level quality project, bureau-level (including prefecture-level) quality project 1 point; Among them, the same project won the above honorary title, only according to the highest score, not repeated calculation.
1.4 quality and safety accident record (2 points)
If the bidder has not had any major quality accident or major personal injury or death accident notified by the Ministry of Railways in the past three years, 2 points will be scored, and 0 point will be scored for any item.
1.5 Confirmation and commitment to the bidding documents (4 points)
If the bidding documents make all substantial responses to the bidding documents, 4 points will be scored; if there are any missing items in the commitment to the bidding documents, points will be deducted as appropriate.
1.6 bid document quality (2 points)
The signing of the bidding documents conforms to the requirements of the bidding documents, with complete contents, clear handwriting, neat graphics and text, neat binding and good sealing, and 2 points will be scored, and other circumstances will be deducted as appropriate.
2, technical standard (45 points)
2. 1 institutions and personnel to be involved in this project (4 points)
2. 1. 1 Construction organization, technical director and safety and quality inspector to be invested (2 points).
2. 1.2 project manager's qualification grade (qualification grade certificate required by the tender documents is required) (2 points).
2.2 Construction machinery and technical equipment invested in this project (4 points)
2.2. 1 Construction machinery and equipment can meet the needs of this project, with a detailed list of construction machinery and equipment attached (2 points).
2.2.2 The testing equipment and means are complete, with a detailed list (2 points).
2.3 Quality and safety (12)
2.3. 1 Clear quality objectives (1 minute), perfect management organization and system (1 minute), self-inspection system (1 minute), complete construction process control methods and measures (2 points), and quality assurance measures corresponding to the bidding documents (2 points).
2.3.2 Construction safety objectives meet the requirements of the tender documents (2 points), with construction safety measures (2 points) and safety assurance system and system (1 point).
2.4 Time limit for a project (5 points)
2.4. 1 The total construction period and phase construction period meet the requirements of the bidding documents (1 min).
2.4.2 The construction progress has a crossing chart (1 min).
2.4.3 The schedule of the construction operation plan is reasonable and has a network schedule (2 points).
2.4.4 There are time limit for a project guarantee measures (1 min).
2.5 Construction organization and methods (20 points)
2.5. 1 construction site layout, providing general layout (2 points).
2.5.2 Process cohesion, coordination between construction arrangement of individual projects and overall arrangement (3 points).
2.5.3 Construction personnel deployment, main labor force and material supply meet the requirements of engineering construction (2 points).
2.5.4 Detailed and correct technical measures for project implementation (2 points).
2.5.5 The construction method is feasible and the technological process is reasonable (3 points).
2.5.6 Strictly implement construction specifications and standards, and have sound rules and regulations (3 points).
2.5.7 There are corresponding civilized construction, environmental protection, soil and water conservation and cultural relics protection measures (2 points).
2.5.8 The content of the construction organization is detailed and complete, with clear written expression and strong logic (3 points).
3, economic standards (40 points)
The following two bid evaluation methods are determined by the tenderer, and the deduction standard can be adjusted by itself.
3. 1 No pre-tender estimate, only promises:
Promise whether to agree to deduct Party A's related expenses (reduced by%) from the approved budget estimate as the total contract price, that is, 10000 yuan (including/excluding second-class changes) (it must be indicated in words and stamped with the seal of the legal person and legal representative).
Promise 40 points, not promise 0 points.
3.2 When setting the pre-tender estimate, the bidder must have a specific quotation (with the official seal of the legal person and the official seal of the legal representative).
Quotation score +0(40 points)
3.2. 1. 1 Best quotation range:
If the bid price is within the range of [-0.5% ~ 0] (hereinafter referred to as the platform), score 40 points;
3.2. 1.2 When the bid price is higher than the upper limit of the platform, for every 1% higher, subtract 10; When the tender offer is lower than the upper limit of the platform, 5 points will be deducted for each low 1%; Less than one percentage point, calculated by interpolation method.
3.2. 1.3 Pre-tender estimate (pre-tender estimate proposed by the tenderee) shall be stamped with "Certificate of Registered Cost Engineer", which shall become effective after being examined and sealed by the Tendering Office. When opening bids, the tenderer will announce the pre-tender estimate on the spot under the supervision of the supervisor.
3.2. 1.4 The bidder's quotation is valid within the range of [-4% ~ 0] of the basic pre-tender estimate, and the quotation beyond this range does not participate in calculating the average value of the bidder's effective quotation in the comprehensive pre-tender estimate formula.
3.2. 1.5 Determination of comprehensive pre-tender estimate:
Comprehensive pre-tender estimate = basic pre-tender estimate ×60%+ average effective quotation ×40%
3.2. 1.6 If the quotations of all bidders are higher than the pre-tender estimate, the tenderee shall reorganize the bidding.
3.2.2 The bidder must prepare the tender offer according to the tender documents.
4. 10 Sign the construction contract
4. 10. 1 The winning bidder shall sign a construction contract with the tenderee within 30 days after receiving the letter of acceptance.
4. 10.2 The winning bidder shall specify the bank account and the special account for migrant workers' wage deposit in the contract, and the tenderee shall supervise the winning bidder's bank account and supervise the use of funds for migrant workers' wage deposit account according to regulations.
4. 10.3 The construction unit can be extended to the winning bidder during the railway internal audit.
4. 10.4 The winning bidder shall set up a special bank account, deposit the wages of migrant workers in advance, and promise to cash the wages of migrant workers in time.
4. 10.5 The winning bidder shall sign a clean government agreement with the tenderer in accordance with regulations.
4. 10.6 The construction contract of this project must adopt the model text of Railway Construction Contract of the Ministry of Railways (see Chapter 3 for details).
4. 1 1 Assessment meeting agenda
1, declare the meeting open.
2. The host introduces the tendering unit, the person in charge of the tendering unit, the judges, the supervision department and personnel.
3, introduced by the host access procedures, qualification examination, credit filing.
4, read out the bid evaluation method:
This tender is without pre-tender price, and the comprehensive scoring method is adopted, with the full score of 100. Including business standard 15, technical standard 45 and economic standard 40. The economic bid adopts the quotation system, and the lowest score is arranged in turn, and the highest score is the first winning bidder.
5. Draw lots to decide the bidding order.
6. Under the supervision of supervisors, the tenderee will open the pre-tender estimate (basic pre-tender estimate).
7. The staff will open the bidding documents in public in sequence, and the bidders will read out the quotation commitment (or quotation) in sequence. And sign the commitment registration form. (All bidders leave after reading)
8. Sing the bid in order and reply (briefly introduce the company's general situation and operating performance, and answer the questions raised by the judges).
9. When the judges evaluate the bid, the staff will calculate the score.
10, the bid evaluation result and the winning bidder will be announced by the director of the bid evaluation committee.
1 1. Speech by relevant leaders.
12, declare the meeting closed.
Chapter II Format of Bidding Documents
1, sealed envelope of bid documents
Project name:
throw
mark
writing
piece
Bidder:
Legal representative (or entrusted agent):
2. Bid guarantee
Recipient:
After inspecting the project site and studying the tender documents and related documents of your railway project, we agree to deduct the relevant expenses of Party A (production reduction%) as the total contract price, that is, ten thousand yuan (including/excluding secondary changes), and implement and complete all the projects specified in the tender documents according to the requirements of the tender documents, and remedy any defects.
If we win the bid, we promise to start work within the commencement date required by you after receiving the commencement notice, and complete and deliver all the projects according to the construction organization design.
Before the formal contract comes into effect, this tender document together with your letter of acceptance will constitute a binding contract between us.
We understand that you may not necessarily accept any bid documents received. At the same time, we also understand that you will not bear any expenses for our bidding.
Legal representative or authorized agent:
Bidder: (official seal)
date month year
3. Power of attorney:
power of attorney
The legal representative entrusts him as an agent to participate in the project bidding work, and authorizes him to sign the bidding documents and bidding negotiations, sign contracts and perform all related affairs on behalf of the unit in the implementation, delivery and defect repair of related projects.
I sign my name below to prove it.
Client (signature) (official seal)
date month year
Authorized Agent (Signature)
date month year
4. Bid security:
Bid guarantee format
Tender number:
To: [full name of bidder]
In view of the fact that [full name of tenderer] (hereinafter referred to as "bidder") is the construction and completion of [name of railway construction project], the tender documents (hereinafter referred to as "tender documents") will be held on.
According to the documents, it is hereby announced that [full name of the bank] (hereinafter referred to as "the bank") has set up a registered office in [place], and we are bound by [full name of the tenderer] (hereinafter referred to as "the bidder"), and the guarantee amount is RMB [in words and figures]; The money shall be paid to the above-mentioned tenderee correctly and legally by the bank, its successors and assignees according to this document. Stamp the official seal of the bank and sign it by its legal representative or its authorized agent. The obligations of this guarantee are as follows:
1. If the bidder withdraws the bid documents within the bid validity period specified in the "Instructions to Bidders" in the bidding documents; or
2. If the tenderer informs the bidder of winning the bid within the validity period of the bid, and the bidder receives the notice within 30 days:
(1) Failing to sign or refusing to sign the contract as required; or
(2) Failing to provide performance bond or refusing to provide performance bond according to the requirements of the instructions to bidders. or
(3) Do not accept the price correction made according to the bid evaluation method.
We guarantee that after receiving the first written request from the tenderee, we will pay the above money to the tenderee without any proof from the tenderee. However, in the written request from the tenderee, we should indicate that what happened is due to one or more of the above circumstances, and specify the situation.
The validity period of the letter of guarantee is the validity period of the bid and 30 days after the expiration of the validity period. Any claim for the guarantee should be handed over to the bank before the expiration of the validity period.
The validity period is from year month day to year month day.
Name of bank/financial institution: [full name of bank] (official seal)
Legal representative:
Or authorized agent: [name] (signature)
Location:
Date:
Address:
Postal code:
Telephone:
Fax:
5. Quotation commitment
Offer acceptance
After deducting Party A's related expenses (reduced by%), the total contract price is ten thousand yuan (including/excluding secondary changes).
Bidder:
Legal representative:
date month year
6. Confirmation and commitment to the tender documents:
Confirmation and commitment to the bidding documents
After carefully studying your bidding documents and related materials, our unit decided to participate in the bidding activities of this project with a positive attitude. According to the requirements of the tender documents and related materials, after careful study, our unit solemnly promises as follows:
1. Our company fully confirms and accepts all the contents of your bidding documents.
Second, commitment
1. Time limit for a project: ensure that the time limit for a project required by the construction unit is reached, that the project is started and completed on time according to the approved commencement report, that the construction is arranged compactly, that the time limit for a project is achieved, and that the construction unit resolutely obeys the adjustment and arrangement of the time limit for a project.
2. Quality: Our unit will strictly implement the relevant construction specifications, regulations and acceptance standards promulgated by the state and the Ministry of Railways, and formulate the excellence plan in strict accordance with the requirements of drawings and bidding documents. The qualified rate of the first acceptance of the project quality reached 100%, which achieved the project quality goal and created a high-quality project.
3. Safety: When organizing the construction, our unit strictly abides by the National Regulations on Safety in Production of Construction Projects and the Provisions on Civilized Construction of Safety in Production promulgated by the Ministry of Railways and taiyuan railway administration, formulates feasible safety guarantee measures and strictly implements them, so as to prevent all traffic accidents, personal injuries and equipment accidents, realize safety in production and assume safety responsibilities during the construction period.
4. Environmental protection: comply with the regulations of the state, Shanxi Province and other provinces and cities on environmental protection. During the construction, soil borrowing, soil abandonment, slag abandonment and sewage discharge shall be handled in strict accordance with the design documents, environmental protection requirements and relevant agreements and requirements signed by Party A and local environmental protection departments; Temporary works, the setting of living quarters and the treatment of domestic garbage shall comply with the relevant provisions of environmental protection; The transportation and storage of materials and equipment, the disposal of surplus materials, abandoned temporary works and construction waste conform to the relevant provisions of environmental protection; After the acceptance of the project is handed over, the equipment, surplus materials, garbage and various temporary engineering facilities belonging to it should be immediately removed or removed from the site, or treated according to relevant requirements, so as not to affect, pollute and worsen the surrounding environment.
5. Our company promises that if our company wins the bid, our company will sign a cooperation agreement with relevant departments before construction, and go through necessary formalities according to relevant regulations, and take necessary safety measures before construction.
6. Our company promises that this project will never be subcontracted or subcontracted.
7. Our unit promises to strictly implement the stipulated materials supply, materials and equipment procurement, financial management, engineering inspection and valuation and other related methods and systems in the construction process; When signing the construction contract, the bank account and the special account for migrant workers' wage deposit will be clearly defined in the contract, and migrant workers' wages will not be owed, and the tenderer will accept the supervision of our bank account, the supervision of the use of funds in migrant workers' wage deposit account and the audit of the construction unit. Our company is looking forward to winning the bid. If we win the bid, we will give full play to our advantages and convenient conditions to ensure the safety, quality and time limit for the project. We will sign a contract with you in time to build this project into a qualified project that meets the requirements of design documents and the regulations of the construction unit.
Bidder:
Legal representative:
Address:
Telephone:
date month year
Chapter III Text Format of Construction Contract
Section 1 Text Format
Construction contract of construction project (omitted)
Section 2 Format of Performance Bond
Performance bank guarantee (unconditional) format
To: [full name of employer]
Whereas [full name of the contractor] (hereinafter referred to as the "contractor") has guaranteed to implement and complete the project (hereinafter referred to as the "contract") according to the provisions of [name of railway construction project] (hereinafter referred to as the "project").
Whereas you mentioned in the above contract that the contractor must submit an approved bank guarantee, which will be used as the performance guarantee according to the specified amount;
Our bank (or financial institution) has agreed to issue a letter of guarantee for the contractor;
Therefore, as a guarantor and on behalf of the contractor, we agree to guarantee you a total deposit of [in words] by paying 10% of the contract price. After receiving the first written payment request from the tenderer, we will pay you RMB [guarantee amount] within the above-mentioned guarantee amount, without being picky or arguing. There is no need to issue a certificate or explain the reasons for the request.
Before you lodge a claim with us, we don't insist that you first ask the contractor to repay the above debts.
We also agree that any possible modification of the contract terms between the bidder and the contractor, changes and supplements of specifications or other contract documents cannot exempt us from our responsibilities under this guarantee. Therefore, we don't need to be informed of the above changes, supplements and modifications.
This letter of guarantee shall remain valid from the date of signing the contract to the date of issuing the project handover certificate according to the contract.
Name of bank/financial institution: [whole process of bank] (official seal)
legal representative
(or authorized agent) [signature]
Location:
Date:
Address:
Postal code:
Telephone:
Fax:
Chapter IV Technical Specifications
Technical specifications in a single volume
Chapter V Drawings
Drawings in another volume
Chapter VI Bill of Quantities
Attached is a detailed bill of quantities.